(Material prices continue their upward trend, in particular, cement. Prices below for projects may change and be advised of price increases)
• 2026/11 – Mleghu Orphan Care & Early Learning Centre No 1 (52) Girls Toilet: £1,500
• 2026/12 – Nachimphu Orphan Care & Early Learning Centre No 2 (53) Girls Toilet: £1,500
• 2026/13 – Kanyighe Orphan Care & Early Learning Centre No 10 Girl’s toilet block: £1,500
• 2026/13A – Kanyighe No 10 Inside renovations: £785
• 2026/13B – Kanyighe No 10 Outside renovation: £650
• 2026/13C – Kanyighe Teachers furniture, bench: £175
• 2026/13D – Kanyighe Talking classroom walls: £44
• 2026/13E – Kanyighe Toys Project 17 skipping ropes: £18
• 2026/13F – Kanyighe 12 months food: £312
• 2026/14 – Lufita Toys Project 17 skipping ropes: £18
• 2026/15 – Ilondo Toys Project 17 skipping ropes: £18
• 2026/16 – Matecha Toys Project 17 skipping ropes: £18
• 2026/17 – Mleghu Toys Project 17 skipping ropes: £18
• 2026/20 – TBA 12 months food: £312
• 2025/17B – Block 3 Outside Renovations: £400
• 2025/18B – Block 4 Outside Renovations: £400
• 2025/19B – Block 1 Outside Renovations: £400
• 2025/20B – Block 5 Outside Renovation: £400
• 2025/20B – Block 2 Outside Renovation: £400
• 2025/22B – 40 New Benches: £360
• 2025/9I – Lufita 3 Classroom Girls Toilet Project (45) Phase 3: £1,500
• 2025/9J – Lufita 3 Classroom Boys Toilet Project (46) Phase 3: £1,500
• 2025/12 – Chilambiro Girl’s Toilet Project (44) Phase 1 Pits: £1,500
• 2025/21 – 30 Desk Repairs & Modifications (Await Community): £300
• 2025/22A – 40 New Benches (Await Community): £360
• 2026/4 – Ilondo No 6 Inside walls/floor/roof (WIP): £875
• 2026/4A – Ilondo No 6 Outside walls/Drains (WIP): £785
• 2026/4B – Ilondo No 6 Teachers furniture: £125
• 2026/4C – Ilondo No 6 Floor Mats: £85
• 2026/4D – Ilondo No 6 12 New Benches: £135
• 2026/4E – Ilondo No 6 Talking Walls: £40
• 2026/4F – Ilondo No 6 16 Skipping Ropes: £42
• 2026/4G – Ilondo No 6 Orphan Girls’ Toilet (50): £1,500
• 2026/9 – Inside Renovation (WIP): £950
• 2026/9A – Outside Renovation (WIP): £825
• 2026/9B – Teachers Furniture (WIP): £125
• 2026/9C – 4 Floor Mats (WIP): £85
• 2026/9D – 16 Skipping Ropes (WIP): £18
• 2026/9E – Talking Walls (WIP): £40
• 2026/9F – Girls Toilet (51) Await Funds: £1,500
• 2026/18 – 12 Months Food (Await Funds): £312
• 2025/9 – Lufita Adult Education 6 Months: Lutterworth Rotary – Jan 2026
• 2025/9A – Lufita Adult Ed Equipment (Books/Pens): Lutterworth Rotary – Jan 2026
• 2025/9C – Lufita Classroom 1 Outside: Red Brick – Jan 2026
• 2025/9E – Lufita Classroom 2 Outside: Red Brick – Jan 2026
• 2025/9G – Lufita Classroom 3 Outside: Red Brick – Jan 2026
• 2025/13 – Chilambiro Girl’s Toilet (41): Rugby Rotary Club – Mar 2026
• 2025/14 – Chilambiro Boys Toilet (42): Rugby Rotary Club – Mar 2026
• 2025/15 – Namulundulu Medical Toilet (43): Rotherham Rotary Club – Mar 2026
• 2025/16 – Chendo Medical Outside Walls/Drains/Roof: Turner Family – Feb 2026
• 2025/16A – Chendo Medical Talking Walls & Furniture: Dronfield Rotary Club – Feb 2026
Our volunteer speakers are available to share insights about the work of Bwengu Projects.
To book a talk, please contact us on:
Phone: 01788 819853 | 0790 1620 750
Speakers:
• Tony & Sue Melia
• Sam & Rob Melia
Updated January 2026